Tremor
A model of 5-7 storied building has to be designed with a minimum plan area specified whose stability would be testing on shake table.
Full description about the event can be found HERE.
Competition:
- The Model will be mounted and Lead Weights will be loaded.
- Earthquake-Resistant Test will be done.
Dimensions:
- Minimum plan area of each floor is 400 sq.cm.
- The minimum distance between any two columns is 12 cm.
- The maximum plan dimensions of any floor should not exceed is 32 cm x 32 cm.
- The minimum distance between any two columns is 12 cm.
-
Size of Structural Members
Maximum size of structural members are:- Beam : 12 mm * 20 mm
- Column : 20 mm * 20 mm
- Bracings : 10 mm * 12 mm
Supplied Components:
Material> | Specification | Quantity |
Timber Strips | 1000 mm * 10 mm * 4 mm | 190 sticks |
Cotton String | Cotton Twines no. 6 | 4 m |
PVC Hot Melt Glue Stick | For column base connection | -- |
Fevicol | 85 gm | 2 |
Baseboard | 400 mm * 400 mm * 10 mm | 1 |
Plywood (for Shear Wall) | 150 mm * 2500 mm * 8 mm | -- |
Plywood (for Slabs) | 320 mm * 320 mm * 6 mm | 7 |
Failure Conditions
A model is deemed to have failed under following conditions:- Complete collapse of the model.
- Collapse of one or more storeys.
- The model has deformed excessively (maximum lateral permanent deformation is more than 14% of the gross building height).
- Half or more than half of the columns are detached from the base board.
- Any of lead weights falling off from one of the floors.
-
Violation Penalty
Teams will be disqualified if:- Using other materials that are not specified in the rules.
- The Dimensions are not adhered to.
Rules and Regulations:
- Each team needs to submit an abstract which would contain the proposed model of the building, a brief analysis and drawings (showing all dimensions). Those teams which submit a SAP model file would be encouraged.
- The abstracts need to be submitted latest by 23:59 hrs - 19th September, 2010 to the coordinators in word format.
- Based on the quality of abstracts, the teams which are shortlisted, would be given the materials and other components to proceed for the construction.
Team Specifications:
- Due to the overwhelming response from the students, and huge turn-up in the introductory lecture, we have decided that multiple entries would be allowed from a Pool.
- The teams can have a maximum of four members.
Contacts:
Praveen Agrawal | pragra@iitk.ac.in | +91 9198661024 |
Sachin Agarwal | sachina@iitk.ac.in | +91 9889775678 |
Smit Chandra | smit@iitk.ac.in | +91 9936996691 |